Construction DEFECTS or Construction LITIGATION issues?


Jerry Peck
Construction Consultant


Construction Litigation Consultants, LLC
Construction and Litigation Consultants
Serving Florida and the Southeast


  • Home


  • How I help


  • Curriculum Vitae


  • Links


  • Technical Documents


  • Contact Us



  • "There is no substitute for experience"


    Construction Cost Recovery:

      Review of As-Built or In-Progress Construction for:

      • Compliance to applicable Building Codes
      • Compliance with Contract Documents, including Plans, Drawings, and Specifications
      • Compliance with Manufacturers’ Installation Instructions

        The purpose of the above is to document the compliance or non-compliance of the construction as-built to the Contract Documents, Building Codes, and Manufacturers’ Installation Instructions to assist in identifying the non-compliant areas of construction for correction or revising the engineering. When the choice is made to revise the engineering instead of correction the condition, that is documented as being in non-compliance with the original documents. The original documents is what the original bid was based on, not on revised cost saving engineering.


      Review of Plans, Drawings, and Specifications for:

      • Compliance with applicable Building Codes

        The purpose of the above is to document the compliance or non-compliance of the Plans, Drawings, and Specifications to meeting or exceeding the minimum requirements of the Building Code and allow for the proper installation materials, products, equipment and appliances in accordance with the Building Code.

      • Compliance with Manufacturers’ Installation Instructions

        The purpose of the above is to document the compliance or non-compliance of the Plans, Drawings, and Specifications to meeting or exceeding the minimum requirements of the Manufacturers’ Installation Instructions and allow for the proper installation materials, products, equipment and appliances in accordance with the Manufacturers’ Installation Instructions.

      The purpose of the above Review of the Plans, Drawings, and Specifications is to document the compliance or non-compliance of construction to the Contract Documents, Building Codes, and Manufacturers’ Installation Instructions to assist in identifying the non-compliant construction for correction (Construction Consulting) or litigation (Litigation Consulting).

    Purpose of Reviewing the As-Built or In-Progress Construction, Plans, Drawings, and Specfications stated above:

    The above will assist in determining which non-compliant construction has been re-engineered instead of being corrected and brought into compliance. When revised engineering is accepted in place of corrections to bring the item(s) into compliance, that cost savings should be passed on to you.

    © Copyright 2008 JerryPeck